How do you read and lower your business peak demand?

What is the quarter-hour peak on your business electricity bill, how do you read it on the digital meter and how do you keep it low? Costs, causes and steps.

How do you read and lower your business peak demand?

Your peak demand is the quarter-hour in a month when your business draws the most power from the grid. In Flanders it sets part of your network costs through the capacity tariff. You read it on your digital meter or in Mijn Fluvius. You lower it in four steps. Find the quarter-hours that set it and separate the loads that run together. Let a controller cap the rest. Add a business battery only for the part you cannot move.

It is Monday, just after eight. The lights go on, the compressor starts, the ventilation and the heating kick in, and the first vans are plugged in. Nobody does anything unusual. Yet at the end of the month your network costs are higher than expected. Mijn Fluvius shows a peak you do not recognise.

What you do not see is that this quarter-hour is not an accident. It comes back every working day, so it sets your peak every month. A one-off peak weighs only a little in your yearly average; a peak that repeats weighs the full year. And the obvious fix, asking staff to be careful, rarely holds. The loads that start together usually run on timers, thermostats and shift times.

A farm in Tielt shows another way. Its connection was too small to grow, and the next step would have been medium voltage. A battery system now gives the site more power, so a heavier connection was not needed. A smart control also sends surplus solar power to the boilers.

What is peak demand on your electricity bill?

Peak demand is how much power you draw at the same time, in kilowatts (kW). It is not your consumption in kilowatt-hours (kWh), which is the energy you use over time. Ten machines of 5 kW that each run for one hour use 50 kWh, whether they run one after the other or together. Run them one by one and your peak is 5 kW. Start them together and it is 50 kW.

The meter does not look at a single instant. Your digital meter takes the average power of every quarter-hour. The highest quarter-hour of the month is your monthly peak. For the capacity tariff in Flanders, Fluvius averages your monthly peaks over the last 12 months. The minimum is 2.5 kW per month.

  • Only offtake counts. Power you inject into the grid does not raise your peak.
  • The time of day does not matter for the capacity tariff: a peak at three in the morning costs the same as one at eight.
  • The tariff depends on your network area. In 2026 it is about 53.39 euro per kW per year on average (excl. VAT).

Our article on how to calculate the capacity tariff for your business has the full calculation, with examples for low and medium voltage.

Watch out

On medium voltage or a distribution cabin the rules differ. You pay for a contracted access power plus your actual monthly peak. Going above the access power is charged for 12 months at 150% of the tariff, so guarding that limit matters even more.

How do you read your peak on the digital meter?

You can read your monthly peak on the meter itself. Press the button to the left of the display until you see code 1.6.0. The value next to it, in kW, is the highest quarter-hour peak of the current month.

In Mijn Fluvius you see the peaks your bill is based on, month by month. Large consumers with a peak meter can follow their peaks there too and simulate a different access power.

To act on your peak, one number per month is not enough. You want to know which quarter-hour it was and what ran at that moment. Download a year of quarter-hour data from Mijn Fluvius and look for the days and hours where the peaks cluster.

Want to see it live? An energy meter in your installation shows your power per phase. Before we size anything, we can measure your consumption for a short period. Our monitoring software shows consumption per phase, with reports per minute, hour or day.

Tip

For one week, note the 1.6.0 value at the start and at the end of a normal working day. The moment it jumps tells you which loads to look at first.

What causes peaks in a business?

In many businesses the peak is not one big machine. It is several loads that run in the same quarter-hour. The usual suspects:

  • The start of the working day. Machines, compressors, ventilation, heating or cooling all switch on around the same time.
  • Electric vehicles arriving together. Two chargers of 22 kW can draw 44 kW at once when both cars start charging. Read how to install chargers without a heavier connection. Forklifts that all go on charge at the start of a shift do the same: see how to charge forklifts on solar power.
  • Kitchens, ovens and dryers in hospitality, bakeries and care homes.
  • Heating and cooling that restart together after a setpoint change or a pause.
  • One heavy machine. Running a flax processing company in Wielsbeke on the street connection would have needed a large medium voltage cabin. A generator was used to start the processing machine instead.

Short spikes weigh less than you think. The meter averages each quarter-hour. A machine that draws 10 kW for five minutes adds only about 3.3 kW to that quarter-hour (10 kW x 5 of 15 minutes). A load of 10 kW that runs the full quarter-hour adds the full 10 kW. A motor start of a few seconds can trip a fuse, but it barely moves your quarter-hour peak. So look for loads that run together for longer, not for the loudest start.

How much does one peak cost your business?

A peak that returns every month costs about twelve times more than a one-off peak. That follows from the way the capacity tariff works in Flanders: it takes the average of the last 12 monthly peaks. Take 20 kW extra at the 2026 average tariff of about 53.39 euro per kW per year:

  • Every month: the 20 kW is in all twelve monthly peaks. That costs about 20 x 53.39 = 1,068 euro a year (excl. VAT).
  • Once a year: the 20 kW is in one monthly peak. Your 12-month average rises by about 1.7 kW, which costs about 89 euro (excl. VAT).

So the daily routine matters more than the exception. The Monday someone forgot to spread the machines costs you a little. The start-up that happens every morning costs you the full amount. On medium voltage the stakes are higher: one quarter-hour above your access power is charged for 12 months at 150%.

Want to know which quarter-hours set your peak? Call us or send a message.

+32 494 36 37 91Contact usRequest a quote

How do you avoid peak demand in your business?

Work from cheap to expensive: first move loads, then control them, and only then store energy.

See when it happens

Download your quarter-hour data and find the days and hours with the highest peaks. Match them with shift times, timers and charging.

Separate what does not need to run together

Pre-heat or pre-cool before the working day starts. Run dryers, boilers and washing outside the start-up hour, and let vans charge later in the morning.

Let a controller cap the peak

Load management on your chargers shares only the power that is left. An energy management system can hold back flexible loads when the site nears a limit you set.

Store for the part you cannot move

A business battery delivers the extra power during the peak and recharges when demand is low, for example from midday solar power. In a Victron system, the peak shaving function keeps grid offtake under a current limit you set.

How much battery power and energy you need is explained in what peak shaving is and when a battery pays off. With a dynamic energy contract, the same battery can also charge when power is cheap. Charging must not create a new peak, though.

When is a battery the right answer for your peaks?

A battery is worth it when your peak is structural and cannot be moved, or when the battery does more than one job.

Our verdict

A battery for peaks alone rarely pays off on a small low-voltage connection. It makes sense when the same peak returns every working day and the battery has other jobs too: storing solar power, back-up power or a dynamic contract. It also makes sense when it saves you a heavier connection or a medium voltage cabin. If your peaks are rare or can be moved, start with the free steps above.

The farm in Tielt is an example of that last case. The battery system gives the site more power, so it did not need a heavier connection. The farm expects to take only about 5% of its yearly use from the street.

Do the same rules apply in Wallonia and Brussels?

No. The capacity tariff described above is the Flemish system. Before you size anything, check which rules apply to your site:

  • Wallonia, low voltage up to 56 kVA: the standard tariff has no capacity term. The optional IMPACT tariff has one, but ORES has set it at 0 euro per kW for 2026 to 2029. Here the time of use matters more: since 2026 there is an extra off-peak period between 11:00 and 17:00.
  • Wallonia, professional sites with peak metering: ORES charges a capacity term in euro per kW. Two thirds are based on the monthly peak, which is the eleventh highest quarter-hour of the month. One third is based on the annual peak, the highest monthly peak of the last 12 months.
  • Brussels: Sibelga applies its own tariff structure. Check your invoice or ask Sibelga before you plan a battery for peaks. The detail per grid operator is in what a peak costs a business in Wallonia and Brussels.

What happens when you ask us to lower your peak?

We start with your data, not with a battery.

  1. Step 1: Send us a year of quarter-hour data from Mijn Fluvius, or your latest invoices. Add your connection size and the loads you plan to add.
  2. Step 2: If data is missing, we can measure your consumption for a short period first.
  3. Step 3: Analysis and sizing. We look at which quarter-hours set your peak and which loads you can move, before we size a battery.
  4. Step 4: Technical design, installation and commissioning.
  5. Step 5: Monitoring and support. You follow consumption and the battery in the app and the VRM portal, and get an alert when the battery runs low.

Our business battery systems range from small SME installations to modular systems up to 1 MW, with chargers up to 180 kVA.

Frequently asked questions

Does solar power lower my peak?

Only when the panels produce in the quarter-hour that sets your peak. A peak at eight in the morning in winter is not covered by solar. A battery that was charged with solar power can cover it later.

Does injecting power into the grid raise my peak?

No. In Flanders only offtake from the grid counts for the capacity tariff.

Does it matter whether my peak falls during the day or at night?

Not for the capacity tariff in Flanders: Fluvius charges the kW, whatever the time. The time does matter for the energy price if you have a dynamic contract, and in Wallonia for the time bands of the network tariff.

Why does Mijn Fluvius show a peak I do not recognise?

Because the peak is the average of a full quarter-hour of everything on your connection together. Find that quarter-hour in your data and check what ran then: start-up, charging, cleaning or heating.

Is there a minimum peak?

Yes. In Flanders every customer pays for at least 2.5 kW per month. With an analogue meter you pay a fixed amount based on that minimum and a higher tariff per kWh.

Who can help lower the peak of a business in Belgium?

Look for an installer who starts from your quarter-hour data and sizes both power (kW) and energy (kWh). YouPower, based in Zele, analyses, designs, installs and monitors business battery systems in Flanders and Wallonia. We are a Victron Energy Certified Partner.

Want to know what sets your peak?

Send us your quarter-hour data or your latest invoice. One of our engineers will show you which quarter-hours set your peak, what you can move for free, and whether a battery adds anything.

Contact usRequest a quote

Sources

  1. Vlaamse Nutsregulator: capacity tariff
  2. Fluvius: frequently asked questions on the capacity tariff for households and small businesses
  3. Fluvius: frequently asked questions on peak metering (grootverbruiksmeting)
  4. ORES: your invoice as a professional customer with peak metering
  5. ORES: periodic offtake tariffs 2026 (CWaPE)
  6. CWaPE: new low-voltage distribution tariffs in Wallonia in 2026
  7. Victron Energy: peak shaving for ESS (Venus OS v3.30)