Planning a technical room for a home battery

New build or renovation: how much wall and floor space a large home battery needs, which walls carry it, which cables to lay now and what fire safety asks.

Planning a technical room for a home battery

Give a large home battery its own dry, ventilated technical room. It needs a solid wall and floor, close to the main board. Reserve about 1.3 m of floor width for the battery towers, about 1 m of wall for the inverters, and room to grow. Plan the space around the real home battery dimensions, not around a brochure. Lay the cables and conduits while the walls and floors are still open.

You are building or renovating a large home. The architect has drawn a technical room for the heat pump, the ventilation unit and the boiler. The battery "comes later". One renovator on a Dutch-language forum dug cables to his garage for the heat pump. He added a thick battery cable too: "I do not want to dig again in two years."

What most plans leave out is the second cable. A battery with back-up needs a cable to the main board and a cable back for the back-up circuits. One owner found his battery on the other side of the house from the meter box. His installer said a new line through the whole house for back-up would be "a very expensive job", so he did without. A room drawn only for the heat pump often ends the same way. The battery lands in a cold garage, far from the board, on a wall that cannot carry it.

In Kortenberg we installed our typical three-phase battery with full back-up in off-grid mode: 30.8 kWh and 9 kVA. "Quality deserves a nice finish," as the project page puts it. A finish like that starts with a room that was planned for it.

What goes into the technical room of a home with a large battery?

More than the battery: inverters, a control unit, fuses, often a back-up board, and cables to the meter, roof and router. The heat pump and the boiler often share the room.

Part What it does Where it goes
Battery towersStore the energy (LFP cells)On the floor, against a solid wall
Inverter-chargers (one, or three for three-phase)Turn battery power into 230 V or 3 x 400 V and backOn the wall, as close as possible to the battery
DC fuses and battery switchProtect the thick cables between battery and invertersBetween battery and inverters
Control unit (for example a Victron Cerbo GX)Runs the system and sends data to the VRM portalOn the wall, with a network cable
Back-up boardFeeds the circuits that keep working in a power cutNext to the inverters or the main board
Main board and meterThe link to the gridOften elsewhere: plan the cable route

Do you want the whole house on the battery in a power cut, as in Wetteren? Then the back-up board is large, and the wiring changes. Our article on how a full no-break house is wired covers the switchboard and the changeover.

How much wall and floor space does a large home battery need?

For about 30 kWh with three-phase back-up, plan roughly 1.3 m of floor for the battery and 1 m of wall for the inverters. Add working space in front and room for one more tower.

Take the BYD Battery-Box Premium LVS, a modular LFP battery, as an example. One module stores 4 kWh and weighs 45 kg. A tower of four modules (16 kWh) is 1,227 mm high, 650 mm wide and 298 mm deep, and weighs 199 kg. A single tower goes up to 24 kWh; above that you place towers side by side, with up to four modules each.

The inverters hang on the wall. One Victron MultiPlus-II 48/5000 measures 565 x 320 x 149 mm and weighs 30 kg. For three-phase you use three units of the same model, one per phase. That is about 1 m of wall and 90 kg, before the fuses, the control unit and the back-up board.

Example set-up (about 32 kWh, three-phase) Size Weight
2 battery towers LVS 16.02 x 650 mm wide, 298 mm deep, 1,227 mm high2 x 199 kg = 398 kg
3 inverter-chargers MultiPlus-II 48/50003 x 320 mm wide, 565 mm high3 x 30 kg = 90 kg
Control unit, fuses, back-up boardWall space next to the invertersSmall
Working spaceFree floor in front, so a technician can reach every part

Those are example products, not a quote. Your size follows from your consumption: read how big a battery a large home needs. Want to start smaller? Then reserve the floor for the second tower now. Our guide on expanding a home battery later explains what grows with it and what does not.

Which walls and floors can carry a home battery?

A solid wall of concrete or masonry, and a floor that takes a concentrated load. Both the battery maker and the inverter maker ask for that.

The BYD manual asks for "a solid support surface", concrete or masonry, suitable for the weight and dimensions. The tower stands on its base 12 to 19 mm from the wall and is fixed to it with a wall bracket. Victron asks the same for the MultiPlus-II: a solid surface such as concrete or masonry, and no flammable materials close by.

  • Timber-frame house or plasterboard walls? Plan one solid, non-combustible wall section for the battery and inverters before the finishing starts.
  • Floor: two towers of 199 kg stand on about 0.4 m². That is roughly one tonne per square metre, locally. A concrete slab carries it; on a suspended or timber floor, ask your structural engineer first.
  • Access: a module of 45 kg goes down stairs by hand, but check doors, corners and stairs for the towers and the inverters. The same access counts when the battery leaves again, as explained in what happens to a home battery at the end of its life.

Watch out

Do not hide the battery in a closed cupboard. Our battery location spec says: never cover the battery, and ventilate the room.

How warm, cold and dry should a battery room be?

Between 0 and 50 °C, as constant as possible, dry and ventilated. Outside that range the battery switches itself off.

The location we specify for a battery must be watertight, with constant temperature and humidity and minimal dust. It must stay at least 2 m from a heat source and 0.5 m from the ventilation of the inverter. The room needs ventilation, and children and pets stay away from it.

Both ends of the range cost you something. The BYD datasheet notes that charging is reduced between -10 °C and +5 °C. The MultiPlus-II 48/5000 gives 4,000 W continuous at 25 °C, but 3,700 W at 40 °C. So a frost-free, cool room keeps both charging and power at their best.

The inverters also make heat. At full power, one MultiPlus-II 48/5000 at its best efficiency of 96% loses at least about 170 W. Three of them give off about 500 W: a small heater. A Belgian forum member put it plainly. Inverters often end up "in a small technical room" with fridges, the dryer and the boiler, where it is warm. Put the battery room on the cool side of the house, and give it an air inlet and outlet.

Tip

A heat pump water heater that takes its air from the same room cools that room. One owner with a large battery uses exactly that to keep his utility room cool.

Where should the technical room be: near the meter, the roof or the garage?

Keep the battery and the inverters together, and let the room sit as close to the main board as possible. Distance to the roof or the garage is easier to bridge than distance on the battery side.

The reason is current. One MultiPlus-II delivering 4,000 W draws about 83 A from a 48 V battery, against about 17 A on the 230 V side. Victron recommends 70 mm² battery cables for a MultiPlus-II 48/5000 up to 5 m, and 120 mm² from 5 to 10 m. Its manual adds: do not lay battery cables in a closed conduit. The data cable between a BYD battery and the inverter may be at most 10 m.

So in a new build, draw the technical room next to the main board, or put the main board in the technical room. In a renovation, the board is often in the hall or the cellar. Then the AC cables to the room are the part to plan, not the battery cables.

Building or renovating? Send us the floor plan with the technical room drawn in.

+32 494 36 37 91Contact usRequest a quote

Which cables and conduits should you lay now, even if the battery comes later?

Lay empty conduits and the cables that are hard to add once floors and walls are finished. It costs little during the works and saves breaking open finished rooms.

  • Main board to technical room: a supply cable for the battery system, plus a second cable back for the back-up circuits. At least lay a spare conduit for it.
  • Roof to technical room: a conduit for the solar cables, with room for more panels later.
  • Technical room to garage or driveway: a cable or conduit for the car charger, also for a second car.
  • Network: one or better two network cables from the router to the technical room. A forum member gave exactly that tip.
  • Outside wall: a spare conduit for a generator inlet. Then you can recharge the battery with a generator in a long power cut.

Why a network cable? The control unit sends the data of your system to the free VRM app and portal, where you follow and adjust it. BYD also highly recommends connecting its battery to the internet for remote service. A cable is usually more reliable than wifi through thick walls.

The renovator who dug to his garage got one more tip. Bury a spare conduit, and decide later what goes in it. A conduit you do not use is cheap; a missing one means digging again.

What does fire safety ask from a home battery room?

A place outside escape routes and bedrooms, a smoke detector, ventilation, and where possible a separate space with fire-resistant walls. Belgian fire services give that advice, even though Belgium has no specific placement rule for home batteries.

The Walloon fire zone of Hesbaye advises a dedicated battery space "if your space allows it". EI60 fire-resistant walls separate it from the rest of the building. It calls automatic fire detection "indispensable". For large batteries it also advises a pressure relief vent, a warning sign and an action sheet outside the room.

Brandweer Zone Rand, a Flemish fire zone, asks for a working smoke detector in the room with the battery and good ventilation. It adds: never on your escape route. In a new build, fire-resistant walls and a detector cost little when they are on the plan from the start.

Is a home battery a real fire risk, and what does your insurer ask? Read our article on whether a large home battery is a fire risk. No room inside at all? Then see whether a large home battery can stand outside.

New build or renovation: what changes for the technical room?

In a new build you choose the room; in a renovation you mostly choose the cable route. The rules for the battery itself are the same.

New build Renovation
When to decideAt the design stage, with the architectBefore the floors, screed and plaster are done
Where the room goesNext to the main board, on the cool side of the houseWhere there is space: garage, cellar, utility room
Walls and floorPlan a solid, non-combustible wall and a concrete floorCheck the wall; add a solid section if needed
CablesConduits in the slab and walls, including back-up return and networkUse the crawl space, existing ducts or a trench
Watch out forA room sized only for the heat pumpA damp cellar, a flood-prone basement, narrow stairs
InspectionBattery on the single-line diagram; AREI inspection before you register itA valid AREI inspection to register; new wiring means a new inspection

Every home battery is registered with the grid operator. In Flanders you do that in Mijn Fluvius, with a valid AREI inspection and a single-line diagram of the battery. Our article on registering a home battery explains the steps. Working with an architect on a larger building? Our guide on designing a building with a battery is written for the design team.

Is it a business site rather than a home? Then read battery container or technical room for a business.

How do we plan the technical room with you?

We plan the room together with the battery, not after it. Our team includes three certified battery experts, and we take a future extension into account from the start.

In Lokeren we powered a new home that was built without any grid connection. In the preliminary study we determined the battery capacity it needed, and that capacity can be expanded afterwards. That is the logic for every new build: size now, leave room to grow.

  1. Step 1: We measure or estimate your consumption, including the heat pump, the cars and anything planned.
  2. Step 2: We check your floor plan: the technical room, the walls, the floor, the distance to the main board and the cable routes.
  3. Step 3: We tell you which conduits and cables to lay during the works, so the battery can come now or later.
  4. Step 4: We install, commission and follow the system with you in the free VRM app and portal.

Want to see what our home batteries can do for a large home? Or send us your plans first.

Frequently asked questions

How much space should there be around a home battery?

Follow the manual of each part. The BYD tower stands 12 to 19 mm from the wall. Keep the battery 0.5 m from the inverter ventilation and 2 m from a heat source. Never cover it, and leave working space in front.

Can a home battery go in the attic?

A Flemish fire zone names the attic as an option when there is no shed or garage. Check the weight on the floor, the summer heat under the roof and how the modules get up the stairs.

Can the battery hang next to the main distribution board?

Yes, that is often the best place. The room must be dry, ventilated, between 0 and 50 °C, with a solid wall. It keeps the AC cables short.

Can I prepare the room now and add the battery in a few years?

Yes. Reserve the floor and wall space, lay the conduits and the network cable, and put the room on the plans. The battery then comes in without breaking open finished walls.

Building or renovating a large home?

Send us the floor plan, the planned technical room and your expected consumption. One of our battery specialists will tell you how much space the battery needs, which wall and floor work, and which cables to lay now.

Contact usRequest a quote

Sources

  1. BYD: Battery-Box Premium LVS datasheet (sizes, weights, towers)
  2. BYD: Battery-Box Premium LVS operating manual (installation location, data cables)
  3. Victron Energy: MultiPlus-II datasheet
  4. Victron Energy: MultiPlus-II manual, installation and battery cables
  5. Pompiers Hesbaye: fire protection advice for home batteries (PDF, French)
  6. Brandweer Zone Rand: home battery (Dutch)
  7. Fluvius: placing a home battery (Dutch)
  8. YouPower: solutions page, battery installation conditions

About the author