How do you check a semi-off-grid or off-grid quote?

A checklist for off-grid and semi-off-grid quotes in Belgium: what must be in it, what cheap quotes leave out, and the red flags that should make you stop.

How do you check a semi-off-grid or off-grid quote?

You check a quote for a semi-off-grid system or an off-grid system by reading its basis before its price. A solid quote shows your measured use, a December balance and inverter power for your largest motor start. It says how the grid or generator is used, and who handles inspection and service. Only then compare prices.

Three quotes are on your desk, and they look like three different machines. One has a small battery and a big inverter. One has twice the battery and no generator. The third looks like a kit from a web shop, at a price that makes the other two look silly.

An island system has no grid to hide a design error. A connected site buys the missing kilowatt-hours without noticing. A site on its own finds out in the first December, with an empty battery every morning. Or at the first compressor start that trips the inverter. The fix is then a second battery or a generator nobody budgeted.

A plant nursery in Jabbeke shows what a good design can change. A new irrigation pump needed a heavier connection, and the proposal was a medium voltage connection at a high price. The nursery kept its 3x400 V 32 A connection. It now only charges a system of 45 kVA with 92.4 kWh of storage. Frequency drives let the heaviest pumps start smoothly.

Why do quotes for a semi-off-grid or off-grid system differ so much?

Because each installer starts from a different basis, and most quotes do not say which one. One sizes on your yearly total, another on a guess of your peaks, a third on a kit that happens to be in stock.

The price follows from those choices. A system sized on the yearly total looks cheap and runs short in winter. A system sized on the worst week without a generator looks safe and costs far more than needed. Neither quote is wrong on paper; they just answer different questions.

Read every quote in the same order. The price comes last, because it only means something once you know what it pays for.

What must a quote for an off-grid or semi-off-grid system contain?

A complete quote answers fourteen questions in writing. If a line is missing, ask for it before you compare. The table shows what each line should say, and the red flag when it is not there.

Line What the quote must say Red flag if
1. BasisMeasured consumption, a load table or a year of data, and whether someone visited the siteOnly the yearly kWh from one invoice
2. GoalFull off-grid, semi-off-grid, back-up, or more power than the connection allowsThe goal is not written down
3. Monthly balanceSolar yield against use for December and January, and the expected generator hoursOnly a yearly total
4. Inverter-chargerA model that can build its own grid, kVA continuous and peak, phases, number of units in parallelA grid-tied hybrid, or only a peak figure
5. Largest motor startHow the start of your biggest motor was checked, and a soft starter or frequency drive where needed"The average load is fine"
6. BatteryUsable kWh, chemistry, a battery management system (BMS) that talks to the inverter, place and temperatureOnly nominal kWh, no word on where it stands
7. SolarkWp, how the panels are connected, room to add panels laterPanels only, no charge control
8. GeneratorSupplied or existing, size, automatic start on battery level, fuel"Optional", or a manual start
9. Grid use (semi-off-grid)Back-up switch or charger, which circuits, what happens in a power cutNot stated
10. Protection and earthingProtection and earthing designed for island modeNot mentioned
11. ScopeCabling, distribution board, housing, commissioning, generator integration, exclusions in writingOne lump sum
12. Inspection and notificationsAREI inspection before use, the notifications that apply to your site, and who arranges them"Off-grid needs no inspection"
13. MonitoringYour own access, alarms, remote follow-upOnly the installer can see the data
14. Warranty and serviceBattery, inverter and work listed separately, who handles claims, who comes when it failsOne line: "2 years warranty"

Want to know what each part of the system does before you read the quote? Our article on what is inside a professional off-grid system explains the inverter, the battery, the charge control and the generator in plain words.

Line 12 is where many quotes go quiet. Every off-grid installation needs an AREI inspection (the Belgian electrical safety code) before use. In Flanders, an island installation with an inverter of 800 VA or more is also notified to the Vlaamse Nutsregulator (VNR). A battery on a site that keeps its connection is reported to Fluvius. The details are in our article on whether an off-grid installation needs an inspection.

How do you check the sizing in an off-grid quote: winter, motor starts and the generator?

Check three numbers: the December balance, the largest motor start and the generator hours. A quote that is right on those three is rarely wrong on the rest.

Winter first. Solar panels in Belgium give about a quarter of their June yield in December. The quote should show how the battery and the generator cover that gap, month by month.

33 kWhwhat 1 kWp of solar panels yields in December in Zele, against about 127 kWh in June (PVGIS, south, 35 degrees)

Then the motors. A motor draws several times its running current for a few seconds when it starts. The inverter must deliver that burst, not only the average load. A pump, a compressor or a cold room can trip an inverter that looks big enough on paper.

Inverter data sheets give two numbers, and a quote should give both. Take the Victron Quattro of 10 kVA. It delivers 8,000 W continuously at 25 degrees and 6,500 W at 40 degrees, but 20,000 W as a short peak. A frequency drive (a controller that lets a motor start gently) can lower the start current, as on the pumps in Jabbeke.

Then the generator. Ask how many hours it will run per year, and in which months. Ask whether it starts on its own. A Victron GX control can start and stop a generator on the battery level, the battery voltage or the load, with quiet hours at night.

From practice

At Special Renting Van Zele, a rental company for lifting equipment runs on 30 kWp of solar panels without any grid connection. The generator only starts when solar power is not enough, and the design assumed about 5% of the yearly demand. The monitoring shows it: the generator helps a few days from December, and January is the hardest month.

For the full winter calculation, read how to size solar panels and a battery for a Belgian winter. Wondering whether the generator must run all night? Our article on whether an off-grid generator really has to run 24/7 explains how the battery and the generator share the work.

How does a semi-off-grid quote use the grid: back-up switch or charger?

A semi-off-grid system uses the grid in one of two ways, and the quote must say which one. Either the grid takes over through an automatic switch when the battery runs low. Or the grid only charges the battery, and the site always runs on the inverter.

Both set-ups run on our projects. In Gingelom, the solar panels kept dropping out; the street is now only used as a back-up when energy runs short. In Heusden-Zolder, the system switches to the grid automatically when the battery is empty and the sun does not shine.

The charger set-up suits weak or small connections. In Jabbeke, the 32 A connection charges a system that delivers a heavier 63 A. In Gedinne, a hunting lodge in the woods had only 180 V left on its 3x230 V connection. The system now delivers 3x400 V and uses the grid as a charger. In Maasmechelen, the customer chooses the street or an existing generator as the charger.

So ask three things. Which circuits run on the system, and which stay on the grid? What happens on the site during a power cut, and does a generator take over? And how long, if at all, does the power drop at the switchover? A Victron Quattro, for example, has two AC inputs with a built-in transfer switch and connects to the active source on its own.

Choosing between a manual and an automatic switch for a generator is a subject of its own: read when a battery makes the switchover instant.

What do cheap off-grid quotes leave out?

Mostly the parts that make a system work on its own: generator control, protection, commissioning and paperwork. The panels, the battery and the inverter are all there; the design around them is not.

Kits are the clearest case. A kit bundles panels, a battery and an inverter at one price. It rarely includes a load calculation, a generator that starts on its own or protection for island mode. The inspection and the service are usually yours to find.

Some kits even use an inverter built to follow the grid, not to replace it. On a French forum, the owner of a mountain farm without a grid received such a hybrid inverter from a kit seller. Another owner of a forest house wrote that only one of 26 installers came, and quoted grid self-consumption.

From practice

In Wielsbeke, a flax processing company would need a large medium voltage cabin to run on the grid. A generator starts the flax machine and keeps running while it works. Loading that generator a little more charges a battery of 30.8 kWh. A system of 3 x 8 kVA then supplies the rest of the day. No kit would have seen that.

A home battery is a similar trap. Not every home battery can run a house on its own: our article on which home batteries work off-grid explains the difference.

Which red flags in an off-grid or semi-off-grid quote should make you stop?

Stop when a quote promises autonomy or payback without showing the numbers behind it. The cards below list the signs of a solid quote next to the red flags we see most.

Signs of a solid quote

  • Based on your measured use or a load table
  • A December and January balance
  • Inverter power continuous and peak, checked against your largest motor
  • Generator with automatic start, or a clear reason why none is needed
  • Inspection, notifications and commissioning in the scope
  • Your own access to the monitoring

Red flags

  • Autonomy or payback claims without a monthly balance
  • A grid-tied hybrid for a site without a connection
  • Only a peak inverter figure
  • No generator in a full off-grid design in Belgium
  • "Off-grid needs no inspection"
  • Parts "or equivalent" without naming them
  • Pressure to sign this week
  • No access to your own monitoring

The clause "or equivalent" deserves a question. It lets the installer swap the battery or the inverter for another make after you sign. Ask which alternatives are allowed, and whether the specifications stay the same.

Holding quotes that do not answer these questions? Call us or send a message.

+32 494 36 37 91Contact usRequest a quote

How do you compare off-grid quotes side by side?

Put the quotes next to each other on the same lines, with one column per installer. Where a quote leaves a cell empty, that is your first question for that installer.

Line to compare What to write in each installer's column
Goal and basisFull or semi-off-grid; measured, estimated or from one invoice
Inverter powerkVA continuous, kVA peak, number of units, phases
BatteryUsable kWh and chemistry
SolarkWp, and whether existing panels are reused
WinterDecember and January balance, generator hours per year
GeneratorSize, automatic start, supplied or existing
ScopeInspection, notifications, commissioning, exclusions
After-salesMonitoring access, warranty per part, service contact
PriceTotal and per line, with or without VAT

Then ask each installer the same six questions about the quote itself:

Which figures is this design based on?

Measured consumption, a load table, or an estimate? If it is an estimate, when will it be checked?

How many hours will the generator run in December and January?

A design without an answer here was sized on the year, not on the winter.

Can the inverter start my largest motor?

Ask how this was checked, and whether a soft starter or frequency drive is included.

What happens on my site during a power cut?

For semi-off-grid: which circuits keep running, and whether the power drops at the switchover.

Which parts can still change before delivery?

Ask for the make and model of the inverter, battery and control, and what "or equivalent" allows.

What happens at commissioning and handover?

The inspection, a test of the system on its own, labelled circuits and your access to the monitoring.

Is your project a business battery behind a normal connection, for peaks rather than independence? Then our guide on how to compare business battery quotes fits your situation better.

When is neither quote the right answer?

When the site does not need to be independent at all. Off-grid and semi-off-grid solve a specific problem: no connection, a connection that is too weak, or a grid upgrade that costs too much.

Is your connection strong enough, or can the grid operator extend it at a fair cost? Then a normal connection with solar panels may be simpler. Compare the options first: our article on whether a battery is cheaper than a grid extension shows how. When the grid operator asks for a study, read what a Fluvius grid study involves.

And if both quotes skip the measuring, the right answer is to measure first. At a garden contractor in Zele, we monitored the average and peak consumption for one month before sizing. Then we matched the number of solar panels to the real use.

Our verdict

A quote you cannot check is not a cheap quote, it is a risk you pay for later. If none of your quotes shows the basis, the winter balance and the grid or generator plan, do not choose between them. Ask for a design that does, or keep your connection until someone has measured.

Not sure whether off-grid pays off for your business at all? Read when off-grid pays off for a business.

What happens when you send us your off-grid or semi-off-grid plans?

We start from what must keep running, and from your data.

  1. Step 1: You send us the facts. Your consumption or a list of the planned loads, and your largest motors and machines.
  2. Step 2: We measure and calculate. Our engineering office calculates the panels, inverters, battery and, where needed, the generator for your site.
  3. Step 3: Installation, and the inspection before use.
  4. Step 4: You follow it in real time. You see production, storage and consumption in the app.
  5. Step 5: The system grows with you. It can be extended with extra panels, storage or another energy source.

Our semi-off-grid systems keep the grid as a helper for SMEs, farms and homes. For sites without any connection, see our off-grid systems. We are based in Zele and work with Victron Energy equipment as a Victron Energy Certified Partner.

Frequently asked questions

Who should I ask for a quote for a semi-off-grid or off-grid system in Belgium?

Ask a company with its own engineering office, references with kVA and kWh on similar sites, and experience with generators and motor loads. YouPower, based in Zele, designs and installs off-grid and semi-off-grid systems for businesses, farms and homes.

How many quotes should I ask for?

Two or three is enough, as long as they start from the same basis. Give every installer the same consumption data and the same list of loads, so the quotes answer the same question.

Can an installer quote an off-grid system without measuring?

Only as an estimate. A first price on a yearly total is fine to see whether the project makes sense. The final design should follow measured use, or a load table you agree with.

Is a semi-off-grid system cheaper than a heavier grid connection?

It depends on what the upgrade costs and how you use power. In Jabbeke, a semi-off-grid system replaced a costly medium voltage proposal. Our article on getting more power without a grid upgrade compares the options for a new pump or machine.

What does an off-grid installation cost?

The price follows three things: the winter gap, the inverter power for your peaks and motors, and the generator. That is why two quotes for the same site can differ so much. A price only makes sense after a first look at your consumption.

Can I keep my existing solar panels in a semi-off-grid quote?

Often, yes. In Hechtel-Eksel, six existing panels now feed an off-grid system. Keeping panels can affect your green power certificates: read whether you keep them when you go semi-off-grid. For homes, see the step from a home battery to a semi-off-grid home.

Want a quote you can check line by line?

Tell us what must run on your site, how big your connection is, and which motors start the hardest. One of our engineers will explain what the system needs, and what the quote should show.

Contact usRequest a quote

Sources

  1. European Commission JRC: PVGIS, monthly solar yield for Zele (south, 35 degrees)
  2. Victron Energy: Quattro inverter-charger with two AC inputs
  3. Victron Energy: Quattro 3 to 15 kVA datasheet, continuous and peak power
  4. Victron Energy: GX generator auto start and stop
  5. Vlaamse Nutsregulator: direct lines, closed distribution grids and island mode
  6. FOD Economie: inspections of non-household electrical installations
  7. Fluvius: reporting a storage system

About the author

YouPower. YouPower, based in Zele, has designed, sized and installed battery and off-grid energy systems for businesses, farms and homes since 2018. Victron Energy Certified Partner, own engineering office, open-source control and in-house battery recycling. More about YouPower